United Arab Emirates

Dubai: RTA announces 5-week closure of Floating Bridge from April 17

Dubai: RTA announces 5-week closure of Floating Bridge from April 17

By Web Desk

Published: Fri 14 Apr 2023, 1:59 PM

Last updated: Fri 14 Apr 2023, 2:07 PM

Dubai’s Roads and Transport Authority (RTA) will close the Floating Bridge in both directions for 5 weeks starting this Monday, April 17, 2023 to give way for major maintenance works.

To ensure a smooth traffic flow, the authority has charted out an integrated plan to reroute the traffic to alternative roads and crossings.

These include Al Maktoum Bridge, Infinity Bridge, and Al Garhoud Bridge. RTA will open Al Mamzar Street’s exit for motorists coming from Al Ittihad Street in addition to main roads such as Sheikh Mohammed bin Zayed Road and Emirates Road as follows:

  • Traffic from Sharjah through Al Ittihad Street: To use Al Mamzar Exit which will be open for traffic (previously restricted to Buses and Taxis) to ease the access to the Infinity Bridge via Cairo and Al Khaleej Streets.
  • Traffic from Deira to Bur Dubai through Al Khaleej Street: To use the Infinity Bridge
  • Traffic from Sharjah to Bur Dubai through Al Ittihad Road: To use the Infinity Bridge via Cairo and Al Khaleej Streets, as well as Al Garhoud Bridge or Al Maktoum Bridge.
  • Traffic from Bur Dubai to Deira through Khalid bin Al Waleed Street: To use Al Maktoum Bridge and the Infinity Bridge.
  • Traffic from Bur Dubai to Deira through Umm Hurair Road: To use Al Maktoum Bridge
  • Traffic from Bur Dubai to Deira through Sheikh Zayed Road: To use Al Garhoud Bridge, Al Maktoum Bridge, Infinity Bridge and the Business Bay Crossing
  • Traffic from Bur Dubai to Deira through Oud Metha Road: To use Al Maktoum Bridge and Al Garhoud Bridge
  • Traffic from Bur Dubai to Deira through Al Riyadh Street: To use Al Maktoum Bridge
  • Motorists travelling between Bur Dubai and Deira may use main roads such as Sheikh Mohammed bin Zayed Road and Emirates Road

The authority has said it will monitor and manage the traffic movement to ensure smooth flow during the closure of the Floating Bridge.

Below is a map, indicating the revised routes:

Motorists have been urged to stick to the speed limits and use alternative roads and public transport means.

ALSO READ:



source: khaleejtimes

Show More

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button